Bathroom renovations that hold up

Finished projects from across Ontario, completed by vetted contractors — shown one at a time, with the work behind the walls that decides how long a bathroom lasts.

Financing available from about $99/month.

Finished bathroom with tiled shower and vanity

Why bathrooms are different

Every bathroom looks good on day one

What decides it

Waterproofing, slope, drainage, ventilation.

The four things that determine whether a bathroom lasts three years or thirty.

When you see it

Once. Before the tile goes on.

After that it is behind the wall for the life of the room, and no photograph will ever show it to you again.

What that costs

A cheaper quote is a different answer.

Same room, same fixtures — a different decision about what happens underneath them.

Recent work

Recent bathrooms, start to finish

Primary ensuite with a freestanding tub and walk-in shower behind one glass enclosure
Finished

Project 01

Primary ensuite, tub and shower in one wet room

Durham Region21 days on site

What was done

  • Freestanding soaker tub and shower combined behind a single frameless glass enclosure
  • Marble-look large-format porcelain to the vaulted ceiling
  • Mosaic shower floor, curbed and drained to a centre point
  • Arched window retained and tiled around inside the wet area
  • Double vanity in shaker doors with a quartz top and undermount basins
  • Backlit mirror and wall sconces at each station
  • Champagne bronze fixtures throughout, including a wall-mounted tub filler
  • Wood-look plank flooring outside the enclosure
Primary ensuite with a freestanding tub, glass corner shower and double vanity
Finished

Project 02

Primary ensuite with freestanding tub and walk-in shower

North York21 days on site

What was done

  • Freestanding soaker tub with a floor-mounted filler and handheld
  • Frameless glass corner shower with a low-profile entry
  • Rainfall head and handheld on a slide bar, on a single wall valve
  • Mosaic shower floor with a recessed niche in the wet wall
  • Book-matched large-format porcelain to the ceiling
  • Double vanity with a quartz top and undermount basins
  • Brushed gold fixtures, pulls, mirror frame and lighting
  • Pot lights, a pendant over the tub, and a ceiling exhaust fan
Ensuite double vanity with round mirrors and matte black fixtures
Finished

Project 03

Primary ensuite, corner shower and double vanity

York Region16 days on site

What was done

  • Frameless glass corner shower with a tiled curb
  • Rainfall head and handheld on a slide bar, on one wall valve
  • Hexagon mosaic shower floor and a matching recessed niche
  • Marble-look large-format porcelain on the walls and floor
  • Double vanity in shaker doors with a quartz top and undermount basins
  • Floor-to-ceiling linen tower built in beside the vanity
  • Round mirrors with linear LED sconces above each basin
  • One-piece skirted toilet
  • Matte black fixtures and hardware throughout
Three-piece bathroom with a grey vanity and a walk-in glass shower
Finished

Project 04

Three-piece with a walk-in glass shower

East York11 days on site

What was done

  • Tub removed and replaced with a walk-in shower
  • Frameless glass panel with a fixed return
  • Rainfall head and handheld on a slide bar, on one wall valve
  • Two-tier recessed niche with a herringbone mosaic back
  • Marble-look large-format porcelain on the shower walls
  • Grey shaker vanity with a quartz top, integrated backsplash and undermount basin
  • Frameless mirror with a vanity light bar above
  • Obscured glass retained at the window
  • Brushed nickel fixtures and hardware throughout
Three-piece bathroom with a tub and shower combination and a white vanity
Finished

Project 05

Three-piece with a tub and shower combination

Peel Region9 days on site

What was done

  • Alcove tub with a sliding glass door on a black rail
  • Stone-look large-format porcelain surround, tiled to the ceiling
  • Two-tier recessed niche trimmed in black
  • Obscured glass retained at the window inside the wet area
  • Vanity in shaker doors with a quartz top, integrated backsplash and undermount basin
  • Widespread faucet and a framed mirror with a light bar above
  • Porcelain floor tile with a linear floor register
  • Matte black fixtures and hardware throughout

More finished bathrooms

8 more completed projects.

Finished bathroom renovation with tiled shower
Renovated bathroom with glass shower enclosure
Finished bathroom with freestanding fixtures
Renovated bathroom with walk-in shower
Bathroom renovation with custom tile work
Finished bathroom with tiled shower and vanity
Bathroom renovation with feature tile
Finished bathroom renovation detail

What it costs

No two bathrooms price the same

A refresh that keeps the layout and the plumbing where they are costs less than a full rebuild with the walls open, the plumbing moved and the waterproofing redone. A small room, like a powder room, less again.

Yours is priced in the home, with the room measured. We do not quote a bathroom we have not stood in.

Next step

Get your bathroom priced properly, in person

A consultant measures the room, walks the layout and condition with you, and puts a real number on the project — with monthly financing from about $99 if you want it.

Book a free in-home consultation
100% freeNo obligation to hireAbout 45 minutes