Hamilton's $40,000 ADU grant is closed to new applications.
Build the basement anyway — from about $399 a month
The build is financed in full. Nothing upfront, and no penalty to pay it off early.
Why it closed, and what happens to applications already in
Hamilton's $40,000 ADU & Multi-Plex Housing Incentive Program: The City of Hamilton has confirmed the program reached its allocated funding capacity, and the application portal is now closed to new submissions.
Applications submitted before it closed are still being reviewed by the City of Hamilton. The guidance on this page is kept up for reference and for anyone with an application already in.
Confirmed August 6, 2026 on the City of Hamilton program page. Programs do reopen — we re-check it daily and will update this notice.
Hamilton Secondary Suite / ADU Grant (Up to $40,000)
What Qualifies as a Secondary Suite for the $40,000 Hamilton Grant?
To qualify for the Hamilton Basement Grant, your project must function as a legal secondary suite or additional dwelling unit (ADU). Not every finished basement qualifies - structure, layout, and approvals matter for the Hamilton secondary suite grant, Hamilton basement grant, and ADU grant.
This is NOT the $2,000 plumbing rebate. This page explains what qualifies for the full $40,000 secondary suite / ADU grant.
Hamilton's grant is closed to new applications — the build can still be financed in full, with no upfront cost.
Maximum Grant
$40,000
Coverage
Up to 70%
Requirement
Must Be Legal
What Qualifies as a Legal Secondary Suite or ADU?
A secondary suite is a self-contained unit within a home that is designed for independent living. In most cases, this means a legal basement apartment or additional dwelling unit (ADU).
Self-Contained Unit
Must function as a separate living space.
Legal Compliance
Must meet building code, zoning, and safety requirements.
Grant-Eligible Structure
Must align with eligible construction scope.
Basement Renovation vs Secondary Suite
A finished basement alone does NOT qualify. The project must be structured as a legal secondary suite or ADU.
The grant is strongest when planned as a legal unit - not just a renovation.
Secondary Suite Eligibility Checklist
Separate entrance or access plan
Independent living layout
Code-compliant safety design
Proper permits and approvals
Eligible construction scope
Intended use as a real rental unit
Estimate Your Grant
Move the slider to match your project - we'll calculate everything for you.
We use a typical estimate that about 80% of a basement project qualifies for the grant. Final numbers may vary depending on your scope, permits, and eligible construction costs.
Estimated qualifying costs: $64,000
Grant covers 70% of that amount: $44,800 (capped at $40,000)
Here's what your project could look like:
Estimated Grant
$40,000
Your Real Cost After Grant
$40,000
You're in the ideal range - this project can unlock the full $40,000 grant.
A properly structured basement project can significantly reduce your real out-of-pocket cost.
Example: a $80,000 project could receive about $40,000 back based on a typical qualifying structure.
See What Your Basement Build Would Cost a Month
The grant is closed, but the build is not. Answer a few quick questions and we'll come back with what your project would cost financed.
- Based on your home and project details
- The build is financed in full — nothing upfront
- No obligation
Want the Full Breakdown of the Program?
For a complete explanation of how the Hamilton secondary suite grant, Hamilton basement grant, and ADU grant work - including funding structure, eligibility, and how to maximize your $40,000 - see the full guide.
Looking for the basement-focused version? See the Hamilton Basement Grant.
Make Sure Your Basement Actually Qualifies
Structuring your project correctly can mean tens of thousands more in funding.